Overview

Platform slots are of high value to operators. Recognizing this, Fastorq has made the commitment to provide the necessary equipment to remove old conductor casing and inner strings of casing cemented together, quickly and safely. Fastorq has developed the equipment and has the experience to cold-cut and drill holes in multiple strings of, cemented together, casing into manageable lengths prior to laying down at the surface. We use drill presses, mounted upon the outside of the casing to drill and pin together multiple strings which may or may not be completely grouted together. Once the hole is drilled the drill press is removed and the pin is placed to provide an effective but temporary lifting device. Then multiple strings of casing are cut in a length that the lifting equipment can handle. This operation is repeated until all old casing is removed and the slot is clear and available for the operator to begin his drilling program. We are committed to procedural review and as a result have made improvements to equipment and procedure which have made for the safe and efficient removal of multiple casing strings.

Applications

  • Topside Flameless Pipe Removal Service
  • Drilling Slot Reclamation
  • P & A Multiple Casing Strings Removals
  • Platform Removals
  • Platform Leg Sounding

Features & Benefits

  • Fastorq's Slot Recovery Procedure
  • Cold-Cutting Versus Torch Cutting
  • Reduces Scrap and Clean-Up
  • Saves Rig Time
  • Eliminates Production Shut-In
  • Performed by Experienced Crews
  • Certified Lifts

Drilling a 1 1/2" to 6" hole through the pipe and pinning prevents the inner strings from falling out in case of loose and weak cement. The pin then can be used as a lifting device to pull the string to the next cut level.

Capabilities

  • Cold-Cuts Single or Multiple Strings up to 48"
  • Many Package Options
  • Drill 1 1/2" to 6" Diameter Holes
  • Pinning Capabilities up to 430,400 Pounds
  • Underwater Service Adaptable
  • Certification to Match Job Scope
  • Pins, Slings, Shackles

Equipment

The Guillotine Saw; designed to quickly & safely cut through multiple casing strings and cement at once.


Fastorq's pin system assures safe lifting of cut casing strings.


Fastorq's Superband Saw cutting 36" conductor with multiple strings.


Freshly cut with Fastorq's guillotine saw.